A goal of our developments is to provide cost advantages to the foundry. Either by reduction of the operating cost by remelting the biscuits and runners, or by supplying the ideal conditions for casting.

Remelting (recycling) in the central furnace (indirectly heated), prevents external recycling costs, including transport costs, temporary storage costs, and reduces crucially the costs of the storage of the raw material.

Remelted material is quality wise equivalent with new material and can be either automatically casted to ingots again, or - still more economically ? filled directly into the machine furnaces in liquid.

Ideal conditions for casting can be realized, if the zinc is available with constant level and constant temperature at the gooseneck chamber.

Rauch has already developed in the 1984 a machine furnace, which fulfilles both demands with two separated crucible chambers. The logical continuation of this is done by the connection of remelting and automated transport of the material to the machine furnaces. This is done with central remelting process as well.

 

Products:

  • Zinc machine furnaces with a one chamber crucible (ZMO), in different sizes, melting capacity from 90 to 350 kg per hour.

  • Zinc machine furnaces with a two chamber crucible (ZMOSZ) with pump, in different sizes, melting capacity from 90 to 350 kg per hour.

  • Zink melting furnace (ZSO) with a melting capacity of 450 to 700 kg per hour. Electrical heated, or fuel heated (natural gas).

  • Zinc melting furnace (ZSOR), melting capacity of 850 kg per hour, fuel heated (natural gas), with circulator in the crucible ? also suitable for remelting of overflows.

  • Zinc melt container (ZSB), with a melt content of 450 kg.

  • Zinc conveyor (ZFB) for automated filling of the melting furnaces.

  • Zinc ingot casting conveyor (ZMGB), with a casting capacity of 450 to 600 kg per hour.

  • Lifting and tilting device (HUK) for a safe filling of zinc melting furnaces, with a lifting force of 60 kg.

  • Container emptying device (BEG) for emptying of scrap containers with a weight of 500 kg or 1000 kg.

  • Liquid transport system with fork lift truck (ZFTS) to carry a zinc melt container (ZSB).

  • Zinc liquid transport with trolley system (ZFTH), to carry a zinc melt container (ZSB), with single sided or double sided transfer of the liquid melt.